Skip to main content
Loading…
This section is included in your selections.

The applicant shall submit construction drawings for all required site improvements together with fees sufficient to cover all City costs in reviewing and processing the drawings. Such applications for site construction shall be processed as Type 2 permits under Chapter 14.20 SMC. The City Engineer shall determine whether the drawings conform to the design and development standards of the City. If they do not comply, the City Engineer shall return the drawings to the applicant with a letter of correction. If the drawings meet City standards, the City Engineer shall approve the drawings, issue construction approval, and collect the required fee deposit to cover construction inspection. (Ord. 2353, 2018)