A. Construction Changes. Whenever changes must be made to the original, approved plan, the changes shall be submitted in writing and approved by the City Engineer in writing in advance of the construction of those changes.

B. Final Reports. Upon completion of the rough grading and at the final completion of the work, the City Engineer may require the following reports, drawings, and supplements thereto to be prepared and submitted by the owner and/or an appropriate qualified professional approved by the City Engineer:

1. An as-built grading plan, including original ground surface elevations, final surface elevations, lot drainage patterns, and locations and elevations of all surface and subsurface drainage facilities.

2. A soils grading and/or geologic grading report, including locations and elevations of field density tests and geologic features, summaries of field and other laboratory tests, and other substantiating data and comments or any other changes made during grading and their effect on the recommendations made in the approved grading plan.

C. Notification of Completion. The permittee or their agent shall notify the City Engineer when the grading operation is ready for final inspection. Final approval shall not be given until all work has been completed in accordance with the final approved grading, erosion sedimentation control and other required plans, and the required reports have been submitted and accepted. (Ord. 2315, 2016)