Skip to main content
Loading…
This section is included in your selections.

All community water systems must comply with the cross-connection control requirements of WAC 246-290-490. The City’s authority over cross-connection control shall begin at the water supply source and includes the entire public water treatment, storage, and distribution facilities. The City’s authority ends at the point of delivery to the consumer’s water system, which begins at the downstream end of the service connection or water meter located on the public right-of-way or utility easement.