Skip to main content
Loading…
This section is included in your selections.

A. When the proposed scope of work requires installation of, connection to, or use of the City’s water system, the user/consumer shall provide the purveyor with a detailed plumbing diagram of all plumbing fixture types and locations. Plans shall provide cross-connection protection, type of backflow assemblies and installation requirements. No construction or use of water system service, whether permanent or temporary, will be permitted until the City has reviewed and approved the plans for compliance. The local administrative authority and the City will coordinate and conduct a cooperative plan review.

B. When the scope of work is within an existing building, facility, use or parcel and involves new construction or remodeling, the consumer shall provide the City with the detailed drawings and plumbing diagrams proposed for review and approval. The plans shall provide cross-connection protection, type of backflow assemblies and installation requirements. In multi-tenant facilities, a complete plumbing diagram which details existing conditions, including protection methods, are required to be submitted to ensure that no potential cross-connection exists or may cause a hazard to be created which would affect the City’s water system. The local administrative authority and the City will coordinate and conduct a cooperative plan review.