15.17.150 Multiple Connection Points.
This section is included in your selections.
If the real property abuts more than one utility improvement for which there is a reimbursement charge, the Director shall select the improvement to which connection shall be made, based on engineering, safety, and topographical considerations. (Ord. 2202, 2010)